Project: Various
Value: Undisclosed
From 2020, Aliro and ISPT partnered with Risk Factors Australia for their Safety in Design workshops nationally. The scope included the management of Safety in Design process for a range of developments through to final design stage. The primary objective of the SiD process was to ensure that the design of any structure is safe to construct, operate, maintain and decommission.